~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
main entrance
The school footprint
McKeever site plan
PreK hall - note green stripe over yellow in this hall.
prior to unpacking classroom materials - most furniture not yet delivered
some built-in shelving not yet installed.
Classroom sink - with faucet control in front so little arms will not have to reach across and
water fountain included.
front door from classroom window
patio area by front entrance from classroom window
Pictures of progress - May 2013 -
reception area for whole school
to the right of the previous picture - entry hall reception area
Nurse clinic
Nurse clinic
Nurse office
Nurse office restroom on left - Nurses office door on the right
wall in nurse clinic
restroom tile detail
restroom tile detail
Tile colors used in restrooms
Purple wall in staff room. This wall may have some wall furniture
workroom for whole school
workroom for whole school
green wall
restrooms for 1st and 2nd grade ?
restrooms for 1st and 2nd grade ?
pre K classroom
pre K classroom
pre K classroom
restroom for 1 classroom
Pre K classroom exterior wall (left)
Pre K classroom exterior wall (right)
Pre K Classroom - hallway wall - computer counter
Pre K classroom - outer wall base cabinet detail
Pre K classroom exterior wall - teacher cabinet (middle of wall) <
Pre K classroom exterior wall - ( right of wall) door on right is restroom door
corner - Outer wall on right - wall between classrooms on left
red wall
pre K classroom outer wall red wall - (sandras ?)
pre K classroom
pre K classroom
pre K hallway
---
Library
Library
Library
____
Music Room storage closets
Music Room
Music Room
Music Room
Music Room
Music Room
Music Room
____
portico outside library
portico outside library
portico outside library
____
Gym on left - Cafeteria on right
Cafeteria from outside
pictures at end of May 2013 - update 9 Aug 2013 - update 15 Aug 2013 - update (site plan) 18 May 2014
-